Mount Ousley Interchange


BIM support and 3D modelling.


Source: TfNSW Online; Mount Ousley Interchange Artistic Impression

 

CSS's expertise in digital engineering and BIM leadership has been instrumental in ensuring a smooth transition from design to construction. 


By delivering precise and coordinated BIM models, CSS facilitated the development of a construction-ready design that met all project milestones during the pre-construction phase. As construction progresses, the groundwork laid by CSS's collaborative efforts and innovative approach continues to support efficient project delivery and alignment with stakeholder expectations. The Mount Ousley Interchange is poised to become a significant infrastructure achievement, reflecting CSS's commitment to innovation, technical excellence, and collaborative project delivery.

Location: Wollongong, New South Wales

 

Technical innovations achieved

The Mount Ousley Interchange Design and Construct project aimed to deliver a safer, more efficient, and sustainable interchange for one of NSW key transport corridors. This landmark infrastructure project provided improved connectivity, reduced congestion, and enhanced safety for freight and commuter traffic traveling along the Princes Motorway and the Illawarra region.

 

Benefits to the client

CSS played a pivotal role in the project, leading the BIM efforts for all structural components as the SMEC Structures BIM Lead. The role encompassed the following key responsibilities:

BIM Leadership:

  • Oversaw and coordinated BIM processes across a diverse and multidisciplinary team comprising CSS and SMEC personnel.

  • Delivered integrated and precise BIM models for all structural assets, ensuring alignment with TfNSW standards and project requirements.

 Team Oversight and Collaboration:

  • Managed a collaborative team of engineers, drafters, and digital specialists from CSS and SMEC to ensure seamless workflows and efficient project delivery.

  • Fostered effective communication between CSS, SMEC, and the Managing Contractor, ensuring alignment of objectives and expectations.

 Innovation and Quality Assurance:

  • Delivered innovative digital engineering solutions, streamlining design coordination, and reducing clashes and rework.

  • Maintained rigorous quality control standards throughout the design process up to issuing Final Documentation Design, contributing to a smooth design-to-construction transition.

 

Source: Revizto Federated Model; BR01 Over Princess HWY and BR03 Heavy Vehicle Bypass

Source: Revizto Federated Model; MS03 Noise wall Along Princess HWY

Source: Revizto Federated Model; RS01 and MS01 Retaining Wall and Noise wall Along Mount Ousley Road and BR2A Pedestrian Bridge Over Princess HWY On Ramp

Source: Revizto Federated Model; BR04 Pedestrian Bridge University Access

Source: Revizto Federated Model; Mount Ousley Interchange Design Models

 
STAFF INVOLVEMENT

Vince Scolaro:
Project Director and Bridge Lead

Ryan Dewar:
Project Manager and Bridge Engineer

Michael Moreno:
3D modelling and BIM Manager

Brendan Quinn:
Senior Bridge Drafter

Mehran Ameli:
Construction Phase Support Engineer

CLIENT

SMEC
Fulton Hogan
Transport for New South Wales (TfNSW)